quarta-feira, 15 de março de 2017

New robot sent into Fukushima reactor 1 to study radiation

(FILE) A Tokyo Electric Power Co. (TEPCO) employee measures radiation level of 213 microsievert per hour in front of the No. 2 (L) and No.3 reactor buildings at TEPCO's tsunami-crippled Fukushima Daiichi nuclear power plant in Okuma town, Fukushima prefecture, Japan, 10 February 2016. EPA/TORU HANAI / POOL
The operator of Japan's Fukushima nuclear plant introduced a new robot into Reactor No. 1 Tuesday to measure radiation levels inside and evaluate its condition ahead of a future dismantling.

The self-propelled, remotely-operated robot is equipped with a video camera, thermometer as well as dosimeter - to measure radiation - among other sensors, said the Tokyo Electric Power Company in a statement.

Source: EFE

Nenhum comentário:

Postar um comentário